Thanks NWPO, The main thing that hit me, the salaries, £1.700.000. with a total cost of £2.500.000 million p.a.
the second link shows the period 2001/2013 with a total loss of £18.000.000.million, for the three venues, VC,TC and the tram, ( I have written the words million, because its so hard to believe these figures) .
I do not fully understand accounting, but, with these simple breakdowns, a child could see the problem, as I said before, whoever is allowing this to continue, needs FIRED.
Or we should all apply for a salaried position at VC.....