Work to carry out essential repairs to streetlights on the A470 will see a series of road closures. The works are taking place in Llanrwst town centre.
It will see full closures take place over seven evenings and nights. There will be diversions in place for cars and other smaller vehicles through the town.
Arrangements will be in place to allow deliveries and access for local businesses.
Closure details:
Monday Dec 12 - Friday Dec 16
The A470 in Llanrwst will be closed for 4 nights between 5pm and 1am.
Except on 13/12/22 when the road will be closed between 8pm -1am due to the Christmas Fayre.
Monday Dec 19 - Thursday Dec 22
The A470 in Llanrwst will be closed for 3 nights between 5pm and 1am
Traffic Wales said: "The works are being carried out in the evenings when traffic flows are historically lower to minimise disruption. In the interest of public and workforce safety the A470 Llanrwst Town will be under full closure and vehicular traffic will be diverted through Parry Road, Tal Y Bont Road and School Bank Road. Pedestrian access will be maintained at all times.
"Vehicles over 3m in width will be diverted via the A55 J19 Glan Conwy, A470, A5 and A55 J11 Llandygai. Additionally, arrangements will be in place to allow deliveries and access for local businesses/services in liaison with the principal contractor."
cont
https://www.dailypost.co.uk/news/north-wales-news/a470-closures-conwy-county-emergency-25719353?IYA-reg=49560bcd-5a9c-47f0-8fc5-ba2e71710589