Beach developments - they are currently laying down stepped pre-formed concrete sections between the pier and the Skip-carbuncle (I didn't have my camera with me, unfortunately). And on the other side of the pier, the work on the beach seems mostly done, from what I can make out. Hopefully they'll be opening the beach before the summer is over.