Work at the Clarence Hotel is really moving along at a fast pace. The steel frame of the rear extension is now complete and they are laying the floors. The floor construction method is interesting - instead of craning in concrete beams, they are laying a metal formwork and it looks as though they intend to pump the concrete into that formwork. Not seen that done before.