Planning Applications have been submitted for the next stage of the Waterfront Redevelopment:
"Redevelopment of promenade and coastal defences to
include new walkways and car parking, new pedestrian
link to town centre and new facing to pier "
"Importation of approximately 220,000 tonnes of sea
dredged sand obtained from existing licensed dredging
sites in Liverpool Bay and placing on site on the beach at
Colwyn Bay. Removal of existing timber/rock groynes
from the area of foreshore to be recharged as required.
Extension of existing surface water outfalls. Removal of
existing rock armour from the foreshore to be recharged
and construction of new rock armour toe protection with
the removed material to the west of the recharged works.
Concrete repair works to the existing sea wall."
Full Applications can be read here:
http://tinyurl.com/k26ox8ohttp://tinyurl.com/l9ldf5w